[May 12th (Tue) Prefectural Road 84 Norikura-dake Line (Maekawado to Nakadaira area) will be closed to traffic]

On Tuesday, May 12th, Prefectural Road 84 (Norikura-dake Line) will be closed to traffic for a limited time due to vehicle removal work related to an accident.

■Target date: May 12, 2026 (Tuesday)

■Road Closure Section: Prefectural Road 84 Norikura-dake Line (Maekawado to Nakadaira area)

■Road closure time: 9:00 AM to 2:00 PM (scheduled)


Customers arriving at Norikura Kogen by car during the above time slot on May 12th,
Please detour from Shirahone Onsen to the Kamikochi Norikura Super Forest Road Line B.

Travel time from Matsumoto area (normally +15-20 minutes)
Travel time from Sawando/Takayama area (normally + 5-10 minutes)


The following two buses from Shin-Shimashima Station to Kyukamura will be rerouted.
Departures from Shin-Shimashima Station at 10:50 AM / 12:50 PM
Departure from Kyukamura at 9:22 / 12:07

Trains are expected to be delayed by approximately 15 to 20 minutes from their normal schedule.
Additionally, the bus stop between Nakadaira and Seseragi-no-Yu is unavailable.